J Kumar Infraprojects has been declared the lowest bidder for the pre-engineered building (PEB) roof and architectural finishing contract at five stations of Mumbai Metro’s 23.6 km Line-2B (Yellow Line), with the project expected to be completed by Q2 2025. The Mumbai Metro Line-2B project is a crucial component of the city’s ambitious metro expansion plan, designed to improve urban mobility and reduce traffic congestion. Covering the route from DN Nagar to Mandala, Line-2B will provide seamless connectivity between the western suburbs, central Mumbai, and the eastern corridors. The Pre-Engineered Building (PEB) work is an essential part of the infrastructure development for metro depots, stations, and support structures.
Role of J Kumar Infraprojects
J Kumar Infraprojects Ltd, a leading infrastructure company in India, has emerged as the lowest bidder for the PEB works of this metro line. Known for its expertise in large-scale urban transport projects, the company has previously handled critical civil and structural works for other metro lines, bridges, and flyovers across Mumbai. Winning this bid not only reinforces J Kumar’s industry position but also accelerates the progress of Line-2B. Pre-Engineered Buildings play a pivotal role in ensuring faster construction timelines, cost efficiency, and high-quality finishing. For the Mumbai Metro Line-2B, PEB structures will be. (MMRDA)
- Depot buildings for rolling stock maintenance
- Station roofing and platform covers
- Administrative and operational offices
Impact on Mumbai’s Urban Mobility
This method offers advantages like reduced construction waste, modular assembly, and enhanced durability, aligning with sustainable infrastructure goals. Once completed, Metro Line-2B is expected to transform commuting patterns for thousands of daily passengers. By connecting the western and eastern suburbs directly, it will: (Rail Projects) The successful execution of the PEB works will be a major step toward bringing Line-2B closer to completion. With increasing pressure to enhance urban mobility, the partnership between MMRDA and J Kumar Infraprojects is expected to set a benchmark for speed and efficiency in metro construction.
PEB construction involves the assembly of factory-fabricated steel structures on-site, drastically reducing build time. For Metro Line-2B, these works will include depot facilities, operational buildings, station canopies, and other structural components. This approach ensures higher precision, quality, and sustainability compared to traditional construction methods. With a strong presence in metro rail, flyover, and road projects across India, J Kumar Infraprojects has built a reputation for delivering complex urban infrastructure on time. In Mumbai, the company has previously contributed to key stretches of Metro Line-3, Metro Line-7, and several over-bridges that have eased traffic bottlenecks. Securing this contract further solidifies its position as a trusted partner for large-scale transport projects.
- Cut travel time between DN Nagar and Mandale
- Reduce dependency on road transport
- Ease congestion on existing train networks
The project complements other ongoing metro lines in Mumbai, including Metro Line-3 and Line-4, creating an interconnected rapid transit network. The Mumbai Metropolitan Region Development Authority (MMRDA) is overseeing the project, ensuring adherence to deadlines, quality standards, and budgetary control. The successful awarding of the PEB work to J Kumar Infraprojects marks another milestone in the government’s commitment to expand urban transport infrastructure. With J Kumar Infraprojects set to take up the PEB works, construction momentum for Metro Line-2B is expected to increase in the coming months. If executed on schedule, commuters could benefit from improved connectivity by the projected completion date. The use of PEB technology also sets a benchmark for future metro and infrastructure projects in India.
Q1. What is the latest update on Mumbai Metro Line-2B?
J Kumar Infraprojects has emerged as the lowest bidder for the PEB (Pre-Engineered Building) works.
Q2. What does the PEB work include?
It covers depot structures, operational buildings, and other steel-based infrastructure for the metro line.
Q3. What is the route of Metro Line-2B?
It will run from DN Nagar to Mandala, improving east-west connectivity in Mumbai.
Q4. Who is executing the project?
The Mumbai Metropolitan Region Development Authority (MMRDA) is overseeing the development.
Q5. Why is PEB construction important for this project?
PEB ensures faster construction, higher precision, and sustainable infrastructure delivery.



























