#WaterManagement

L&T Secures Rs 1,000–2,500 Cr Water Supply Project in Guwahati
L&T Larsen & Toubro Limited has received a major order from the Guwahati Metropolitan Drinking Water and Sewerage Board for ...

TERRATEC TBMs Complete 9.1 km Tunnel for Bangkok 9th Water Supply Project Breakthrough
TERRATEC’s earth pressure balance tunnel boring machines (TBMs) completed the excavation of a 9.1 km water transmission tunnel for Bangkok’s ...

Patel Engineering Completes TBM Breakthrough at CIDCO TWT, Boosting Navi Mumbai Water Security
Patel Engineering Limited has successfully completed the Tunnel Boring Machine (TBM) breakthrough at the CIDCO Treated Water Tunnel (TWT) Project ...

Ken-Betwa Project Moves Forward with ILR Reports Breakthrough
Feasibility and Detailed Project Reports have been completed for 26 and 13 interlinking river projects, respectively, under the National Perspective ...

Denta Water Reports Strong Q2 FY26 Performance Breakthrough
Denta Water and Infra Solutions reported a robust operational performance for Q2 FY26, with a 53.80% increase in revenue to ...


























