IST - Saturday, February 21, 2026 4:50 am
Hot News

#HighSpeedRail

Make

Make in India Steel Bridge Ready for Mumbai Ahmedabad Bullet Train Breakthrough

Soniya Gupta

In a notable achievement for Indian Railways, a 100 m ‘Make in India’ steel bridge has been completed over an ...

Young

Young Engineers to Gain First-Hand Experience at Mumbai Ahmedabad Bullet Train Construction Sites

Soniya Gupta

To enhance practical exposure, engineering and technical institutes are invited to participate in educational visits to the Mumbai Ahmedabad Bullet ...

Indian

Indian Railways to Develop 7,000 km High-Speed Passenger Corridor Breakthrough

Soniya Gupta

Indian Railways plans to develop 7,000 km of dedicated passenger corridors by 2047, designed for trains reaching speeds of up ...

Budget

Indian Railways Allocated Budget ₹2.5 Lakh Crore for FY 2024-25 Breakthrough

Soniya Gupta

Indian Railways has received a 5% increase in outlay for 2024-25, with a nine-fold increase from 2013-14. The majority of ...

Varanasi

Meerut Varanasi Vande Bharat to Begin on 28 August Breakthrough

Soniya Gupta

The Meerut-Varanasi Vande Bharat Express will launch on 28 August, marking the first direct train connection between Meerut and Varanasi. ...