IST - Saturday, February 21, 2026 1:13 pm
Hot News

Kochi Metro Begins DPR Preparation for Third Line to Angamaly via Airport Breakthrough

Soniya Gupta

Updated on:

Kochi

Kochi Metro Rail Ltd (KMRL) is preparing a Detailed Project Report (DPR) for its third metro line, extending from Aluva to Angamaly via Kochi airport. The DPR work has been awarded to Haryana-based Systra MVA Consulting India Pvt. Ltd. The Union government has approved the preparation at ₹1.3 crore (Metro Rail) Kochi Metro Rail Limited (KMRL) has begun preparing the Detailed Project Report (DPR) for its much-awaited third metro line, extending from Aluva to Angamaly via Cochin International Airport. This strategic expansion aims to boost connectivity for millions of passengers, ease traffic congestion, and provide seamless access between

the city and Kerala’s busiest airport. The proposed metro line will significantly benefit daily commuters, air travellers, and residents of Ernakulam district by offering a sustainable and efficient transport system. Once completed, the project is expected to improve urban mobility, promote eco-friendly travel, and strengthen the state’s infrastructure network. The DPR will evaluate technical feasibility, environmental impact, route alignment, and estimated cost before final approvals. This development marks a major milestone in Kochi Metro’s vision to enhance public transport and connect key economic hubs across Kerala Kochi Metro Rail Limited (KMRL) has taken a significant step forward by initiating the Detailed Project Report (DPR).

For its third line, extending from Aluva to Angamaly via Cochin International Airport (CIAL). This ambitious expansion is not just a transportation upgrade but also a strategic infrastructure project aimed at transforming connectivity in Kerala. The DPR preparation marks the foundation for a metro line that could redefine urban travel, reduce congestion, and boost economic development. The proposed Aluva–Angamaly route via CIAL holds immense importance for both residents and travellers. With Kochi International Airport serving as one of India’s busiest airports, the metro connection will create seamless transit between the airport and the city. This line is expected to reduce dependency on road transport, minimize traffic congestion on NH-47, and encourage eco-friendly mobility. Such initiatives align with India’s larger mission.

Kochi Metro’s Long-Term Vision

Kerala, known as “God’s Own Country,” witnesses high tourist inflows, both domestic and international. A metro link to the airport will enhance the overall travel experience, making Kerala more accessible for visitors. Additionally, the line will connect towns such as Aluva, Athani, and Angamaly, fostering regional trade and commerce. Similar to the success of the Kochi Airport metro line will contribute to faster business travel and increased investment opportunities. The DPR will study the environmental effects of the proposed alignment. Metro railways are inherently greener compared to conventional road-based systems, offering a low-emission alternative to cars and buses.

This is in sync with India’s commitment to reducing carbon emissions under With energy-efficient trains and modern stations, the project will support sustainable urban growth in Kerala. While the project promises transformative benefits, challenges such as land acquisition, funding approval, and technical feasibility remain. The DPR will analyse these hurdles in detail before finalizing the project plan. Securing funding from central and state governments as well as international agencies will be crucial. However, considering Kochi Metro’s successful track record with its Phase 1 and 2 lines, experts are optimistic about timely execution.

Kochi Metro is steadily becoming a role model for urban transit systems in India. Its integration with water metro services and feeder buses showcases a holistic transport model. With the addition of the third line, Kochi will move closer to achieving world-class connectivity standards. Citizens can expect reduced travel time, affordable tickets, and enhanced comfort. More updates on existing lines can be found on the (Kochi Metro) The DPR preparation for the Kochi Metro’s third line is more than just an infrastructural step it is a visionary leap toward future-ready public transport. By connecting the airport with key towns and the city,

Q1. What is the Kochi Metro’s third line project?

The third line aims to connect Aluva to Angamaly via Cochin International Airport.

Q2. Why is the third line important?

It ensures direct metro connectivity to the airport and improves regional travel.

Q3. What stage is the project in now?

KMRL has begun preparing the DPR (Detailed Project Report).

Q4. When will construction begin?

Construction will start after DPR approval and government clearances.

Q5. How will passengers benefit?

It will reduce traffic congestion, save travel time, and offer eco-friendly mobility.